RASSP Manufacturing Interface

TECHNICAL OBJECTIVE
  • Provide mechanisms to significantly reduce NRE and schedule associated with transition of PWB from design to production
BENEFITS
  • Standard data formats minimize need for custom translation software
  • Secure information exchange over public networks provides agility
  • Producibility knowledge from the factory made readilty accessible to design team

DOCUMENTS/PAPERS

The RASSP Manufacturing Interface: Enabling Distributed Design Through an Agile Infrastructure, Results from a Production Implementation - 12/96
Report of Survey Conducted at Lockheed Martin Electronics and Missiles, Orlando, FL - 5/95
Manufacturing Interface Build II Suitability Analysis of C-Link and CIMBridge - 12/95
Build 1 Manufacturing Interface User's Manual - 11/95
Evaluation of Suitability of Industry Standards to Convey RASSP PCA Product Data - 3/95
Proposed Perts Taxonomy for RASSP Manufacturing Library Information - 12/94
RASSP Manufacturing Interface PCA Requirements - 10/94

RESULTS
  • Significany cost and cycle time reductions realized at LMC Ocala manufacturing facility
    • Designed to manufacturing setup cycle time improved by >10x (Gad96) - ex: process plan generation reduced from >14 days to <1 day
    • NRE costs reduced by 40%
    • Manufactruing rework reduced by over 80% (Gad96)
    • Over 100 PCA designed processed
      • eg., Hellfire, Longbow(missile and fire control radar), Lantirn, Wind Corrected, etc.
  • Payback analysis indicates ROI ratio of 6:1 over next 3 years
  • RASSP Manufacturing Interface identified in best practice study sponsored by the US Navy

Previous Quad

Next Quad
WBS Element No.: 1.3.3.
Point of Contact: Linwood Hines (803) 760 - 3488
or e-mail hines@scra.org